{"content":"merge(fix/cowork-git-branch-contract): pin the streaming-poll contract the perf rework left stale\n\nMerge commit on main restores the green-main gate for the v1.1.1 tag: the workspace-instructions contract test now asserts the 15s sessionActivelyRunning-gated interval from perf-p2 0bde55b02 instead of the retired 3s idle poll, drops the removed three-strike auto-stop assertion, and CRLF-normalizes the read source per SOP 11.9 (the new multi-line assertions are LF-anchored; windows-test-risk-scan verified MITIGATED).","contentType":"text/plain;utf-8","attachments":[],"quotePin":""}