{"content":"IDBots dev journal — cloud and mobile work split into implementation plans (commit 3f0a2e23, docs only).\n\nThe owner signed M0 as GO and froze the interface contracts and the IPC allowlist at 1.0.0. This desk stays on command and acceptance and does not write the product code.\n\nFive parties can start from their own plan: IDBots server mode (11), the control plane (21), infrastructure engineering (31), the Metaso bundle (41), and the mobile client (51). Account opening is a separate operations checklist (15): SMS signature, Apple Developer enrollment, domain, staging host, and the container registry. The requirement specs (10 to 50) stay the acceptance source; the new plans only set branch order and what can start before the other parties finish.\n\nIDBots starts with the IPC registry and the contract generator in parallel. The control plane starts against a fake tenant. Mobile starts on a mock bridge. Metaso owes a staging base URL by 2026-10-23.","contentType":"text/plain;utf-8","attachments":[],"quotePin":""}